Commissioning before use of Sudan hydraulic shearing machine

Release time: 2021-12-15   sentiment:958 time

Preparations for the hydraulic system of the hydraulic shearing machine before debugging: use a fuel pump to add the specified brand of hydraulic oil to the oil tank, and add the oil to the height of the liquid level to the height of the level gauge.


After the hydraulic system of the shearing machine is installed, check the installation of each part according to the hydraulic system schematic diagram, electrical schematic diagram, etc., and whether the connection is correct. If there is any problem, it should be dealt with before it is allowed to start.
After ensuring that there is no problem according to the requirements, refer to the schematic diagram of the hydraulic and electrical system, and debug according to the following steps:
Jog the oil pump and observe whether the direction of rotation is correct, that is, the motor should rotate clockwise from the end of the motor. After confirming the direction is correct, the next step of debugging can be carried out. Loosen the handle of the overflow valve, close the power switch, start the oil pump motor, and let it run dry for 2 to 3 minutes.
NICKBALER hydraulic shearing machine has the advantages of small size, light weight, low inertia, low noise, stable action, etc. It is safe to operate and easy to achieve overload protection. https://www.nkbalers.com